Home Site Map Company Profile Search This Site Contact Us.. Feedback

Photo Display

When You Think GrouTing .. Think GrouTech .. Your Professional Grouting Company..  

Grouting Projects

Rail Lines and Dead Lines - No Problem Professional Mixing of High Early Strength Grout in large volumes Only the best products are used by GrouTech

Underwater grouting - We wrote the procedures Proof in underwater grouting - Mission River Bridge

Subsidence a problem ? - Weipa Dump Hopper Dump Hopper Soil / Fines Solidification

Night works as required - Weipa Dump Hopper.

Underground Dames - Constructed by GrouTech Lake Kounpee trial sand solidification

Lake Kounpee when water level was low before construction of an underground dam.

Return to Top

All pages of this Web Page are Copyright © of GrouTech (Aust) Pty Ltd     A.B.N. 26 063 482 833